Two-section therapy pool with moveable floor.
Exemplary architecture in an idyllic position guarantees optimal therapy success in combination with the latest pool technology.
Key data:
Builder: PHV Parkhotel Vitznau AG
Planner: PHV
Year of construction: 2012
Water surface: 100 m²
Stainless steel pool for therapeutic measures.
Underwater window and parallel bars simplify work for the therapists.
Key data:
Builder: LKH Vöcklabruck
Planner: VAMED - hsb
Year of construction: 2010 - 2011
Water surface: 22 m²
In therapy pools (water temperature up to 36° C) the treated water distribution system is of critical importance.
hsb technology guarantees the best hygiene conditions in all pool zones.
Key data:
Builder: VAMED
Planner: Kaufmann und Partner GmbH
Year of construction: 2009 - 2010
Water surface: 40 m²